A pumping project can appear simple on paper: water is introduced at one point and must be pumped to another. In actuality, the distance between these two points may be influenced by elevation changes or the pressure and solids requirements as well as storage capacity, electrical equipment, site restrictions, and fluctuations in flows.

For Romtec Utilities to design a pump station starts with specifying the operational conditions instead of choosing an item from a catalogue. The project specifications could be used to come up with preliminary designs and budgetary data.

Image credit: romtecutilities.com

Begin by asking the simple question: Where are we doing?

The technology is updated immediately.

The flow of domestic sewage is subject to significant daily variations. A wastewater lift station must move that wastewater reliably when gravity conveyance is unavailable or insufficient. Engineers should therefore take into consideration the expected inflow and maximum conditions, pumping capacities Wet-well behavior, discharge specifications, and how the equipment will be maintained and operated.

The difficulties of industrial water are various. The fluids used in a processing or manufacturing facility may require caustic or oily, or heated with high pressure or temperature. Romtec Utilities designs industrial systems to support a variety of applications, from power generation and food processing to data centers as well as pharmaceutical waste and oil and gas plants.

Rainfall could create a completely distinct operating cycle

Stormwater systems might for long periods be inactive and unable to handle activity only to be faced with massive volume during a storm.

For instance, a rainwater lift station with a basin of detention is required to be in line with the drainage plan for the location. When the basin fills up, temporary storage controls the immediate volume and a pumping system then moves the water collected towards an approved discharge point.

Romtec Utilities supplied this type of solution for a company park development located in Norco, California. The pumping equipment was needed to empty the detention reservoir and then discharge it into the stormwater network. The station therefore had to be constructed as part of the drainage infrastructure rather than treated as a separate piece of equipment.

The phrase “package” does not necessarily be a reference to a shelf

Many people believe that a package-pumping system is simply a predetermined collection of parts.

In the case of engineered infrastructure packaging could mean that all major components are incorporated into a single system. Valves and pumps are selected according to their duty specifications.

This approach is particularly useful in situations where a new system has to connect with existing infrastructure. In municipal and industrial structures, there’s not enough space or a perfect environment to install. Equipment might need to be positioned around existing piping, structures or electrical systems as well as operational schedules.

The Real Costs of Capacity Planning

In particular, undersizing can be costly as facilities grow.

At Portland International Airport, Romtec Utilities designed and supplied the sewer interceptor station for the PDX Next expansion. The station was built to provide double the peak flow capacity of the previous system as the airport’s facilities grew.

This illustrates an important aspect of engineering: design conditions should not only be a reflection of what the installation can handle during an average afternoon. Engineers also have to be aware the impact of peak demand.

The Job isn’t Complete When the Equipment Arrives

At time, drawings and calculations have to become an operational system. The coordination of installations and the documentation are vital to long-term success.

What happens after the construction of a pumping device determines the quality of the system. The decisions made during beginning of the design are obvious when equipment needs maintenance, flows increase or storms strike.

Romtec Utilities incorporates these options into a pumping service that is tailored to a specific project. This helps transform individual equipment into an infrastructure that is designed to withstand the challenges they face.